<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:opensearch="http://a9.com/-/spec/opensearch/1.1/" version="2.0">
  <channel>
    <title>Recent Posts in 'Preparations for Circle Line Stage 6' | sgForums.com</title>
    <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    <language>en-US</language>
    <ttl>60</ttl>
    <atom:link rel="search" type="application/opensearchdescription+xml" href="http://www.sgforums.com/open_search.xml"/>
    <description></description>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Scania @ Sun, 10 Aug 2008 01:45:27 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by ^tamago^:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;span&gt;DT21&lt;/span&gt;/21a Bugis&lt;br /&gt;
&lt;span&gt;DT24&lt;/span&gt; MacPherson&lt;br /&gt;
&lt;span&gt;DT30&lt;/span&gt; Tampines&lt;br /&gt;
&lt;span&gt;DT33&lt;/span&gt; Expo (U/C CD Stn)&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;DT 27 looks interesting...&lt;/p&gt;</description>
      <pubDate>Sun, 10 Aug 2008 01:45:27 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8302444</guid>
      <author>Scania</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by 201911 @ Sat, 09 Aug 2008 17:47:46 +0800</title>
      <description>&lt;p&gt;Circle Line- Stadium Station (CC6)&lt;/p&gt;
&lt;p&gt;(Apologies for the large photos- can anyone teach me how to
scale them down?)&lt;/p&gt;
&lt;p&gt;&lt;img src=
"http://i223.photobucket.com/albums/dd163/201911/IMG_0137.jpg"
height="768" alt="" width="1024" /&gt;&lt;/p&gt;
&lt;p&gt;&lt;span style=
"color: #666666; font-family: 'Lucida Grande'; font-size: 10px; line-height: normal; white-space: pre;"&gt;
&lt;img src=
"http://i223.photobucket.com/albums/dd163/201911/IMG_0136.jpg"
height="768" alt="" width="1024" /&gt;&lt;span style=
"color: #000000; font-family: arial; font-size: 16px; line-height: 19px; white-space: normal;"&gt;&lt;img src="http://i223.photobucket.com/albums/dd163/201911/IMG_0135.jpg"
height="768" alt="" width="1024" /&gt;&lt;img src=
"http://i223.photobucket.com/albums/dd163/201911/IMG_0134.jpg"
height="768" alt="" width="1024" /&gt;&lt;img src=
"http://i223.photobucket.com/albums/dd163/201911/IMG_0133.jpg"
height="768" alt="" width="1024" /&gt;&lt;/span&gt;&lt;br /&gt;&lt;/span&gt;&lt;/p&gt;</description>
      <pubDate>Sat, 09 Aug 2008 17:47:46 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8301057</guid>
      <author>201911</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by bus555 @ Wed, 09 Jul 2008 16:06:22 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by ^tamago^:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;span&gt;DT21&lt;/span&gt;/21a Bugis&lt;br /&gt;
&lt;span&gt;DT24&lt;/span&gt; MacPherson&lt;br /&gt;
&lt;span&gt;DT30&lt;/span&gt; Tampines&lt;br /&gt;
&lt;span&gt;DT33&lt;/span&gt; Expo (U/C CD Stn)&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
Really? WOw that would be great!&lt;/p&gt;</description>
      <pubDate>Wed, 09 Jul 2008 16:06:22 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8229969</guid>
      <author>bus555</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by sinicker @ Wed, 09 Jul 2008 14:13:22 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by ^tamago^:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;span&gt;DT21&lt;/span&gt;/21a Bugis&lt;br /&gt;
&lt;span&gt;DT24&lt;/span&gt; MacPherson&lt;br /&gt;
&lt;strong&gt;&lt;span&gt;DT30&lt;/span&gt; Tampines&lt;/strong&gt;&lt;br /&gt;
&lt;span&gt;DT33&lt;/span&gt; Expo (U/C CD Stn)&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
i am so not moving out of this house even after 24years(tho i'm
only 21) here.. &lt;img src="/images/emoticons/classic/icon_lol.gif"
alt="icon_lol.gif" /&gt;&lt;img src=
"/images/emoticons/classic/icon_lol.gif" alt="icon_lol.gif" /&gt;&lt;/p&gt;</description>
      <pubDate>Wed, 09 Jul 2008 14:13:22 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8229741</guid>
      <author>sinicker</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by ^tamago^ @ Wed, 09 Jul 2008 11:50:57 +0800</title>
      <description>&lt;p&gt;&lt;span class=""&gt;DT21&lt;/span&gt;/21a Bugis&lt;br /&gt;
&lt;span class=""&gt;DT24&lt;/span&gt; MacPherson&lt;br /&gt;
&lt;span class=""&gt;DT30&lt;/span&gt; Tampines&lt;br /&gt;
&lt;span class=""&gt;DT33&lt;/span&gt; Expo (U/C CD Stn)&lt;/p&gt;</description>
      <pubDate>Wed, 09 Jul 2008 11:50:57 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8229366</guid>
      <author>^tamago^</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Dark Honour @ Tue, 24 Jun 2008 04:39:54 +0800</title>
      <description>&lt;p&gt;I just do hope the Circle Line will be a complete circle.&lt;/p&gt;
&lt;p&gt;It's a very useful line, as examples can be seen in Tokyo's
Yamanote line or Osaka's Loop Line. [Well, these lines are heavily
congested during rush hour.]&lt;/p&gt;
&lt;p&gt;According to Wikipedia, Bangkok is extending its single subway
line to form a circle too.&lt;/p&gt;</description>
      <pubDate>Tue, 24 Jun 2008 04:39:54 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8190758</guid>
      <author>Dark Honour</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by ^tamago^ @ Mon, 23 Jun 2008 17:39:23 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by SMRT 32373238:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;Just went to Bishan station just now. The new SB platform seems
ready to be in operation within a month...&lt;/p&gt;
&lt;p&gt;They're really gonna wait until CCL opens before they open the
platform?&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
no way. NB must also be ready for CCL opening, and made
air-conditioned.&lt;/p&gt;</description>
      <pubDate>Mon, 23 Jun 2008 17:39:23 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8189135</guid>
      <author>^tamago^</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by takahashi32399691 @ Mon, 23 Jun 2008 17:34:51 +0800</title>
      <description>&lt;p&gt;Not likely, they still have to make the stairs
and&amp;nbsp;escalator&amp;nbsp;linkway to the Circle line.&lt;/p&gt;
&lt;p&gt;According to the artist impressions I saw outside the station,
it should be around the lift, on the side where the old SB platform
is.&lt;/p&gt;</description>
      <pubDate>Mon, 23 Jun 2008 17:34:51 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8189124</guid>
      <author>takahashi32399691</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by SMRT 32373238 @ Sun, 22 Jun 2008 19:18:42 +0800</title>
      <description>&lt;p&gt;Just went to Bishan station just now. The new SB platform seems
ready to be in operation within a month...&lt;/p&gt;
&lt;p&gt;They're really gonna wait until CCL opens before they open the
platform?&lt;/p&gt;</description>
      <pubDate>Sun, 22 Jun 2008 19:18:42 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8186972</guid>
      <author>SMRT 32373238</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Scania @ Sat, 21 Jun 2008 01:25:04 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by Oceane:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
Hello? One of the oldest stations, the station right at the heart
of the NSL. One side upgrade other side must also upgrade what...
if not SB platform have A/C while NB platform no A/C?&lt;/p&gt;
&lt;p&gt;Plus, the main reason why they're doing so is to reduce the
amount of suicide jumpers at Bishan. It's one of the most notorious
places for suicides and they want to install PSD to prevent people
from jumping.&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
Also because there is a link between J8 basement and the new
platform.&lt;/p&gt;</description>
      <pubDate>Sat, 21 Jun 2008 01:25:04 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8183470</guid>
      <author>Scania</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Scania @ Sat, 21 Jun 2008 01:23:14 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by SBS2695H:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
Actually there is nothing wrong with the current NAC layout. I
don't know why SMRT wasted money on the NSL when their focus is the
CCL. Then they will use the new AC Bishan station as an excuse to
raise fares.&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;The construction was not funded by SMRT, but by LTA, since LTA
owns the station and right-of-way of all MRT lines.&lt;/p&gt;</description>
      <pubDate>Sat, 21 Jun 2008 01:23:14 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8183467</guid>
      <author>Scania</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Oceane @ Fri, 20 Jun 2008 19:20:26 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by SBS2695H:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
Actually there is nothing wrong with the current NAC layout. I
don't know why SMRT wasted money on the NSL when their focus is the
CCL. Then they will use the new AC Bishan station as an excuse to
raise fares.&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
Hello? One of the oldest stations, the station right at the heart
of the NSL. One side upgrade other side must also upgrade what...
if not SB platform have A/C while NB platform no A/C?&lt;/p&gt;
&lt;p&gt;Plus, the main reason why they're doing so is to reduce the
amount of suicide jumpers at Bishan. It's one of the most notorious
places for suicides and they want to install PSD to prevent people
from jumping.&lt;/p&gt;</description>
      <pubDate>Fri, 20 Jun 2008 19:20:26 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8182518</guid>
      <author>Oceane</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by SBS n SMRT @ Fri, 20 Jun 2008 18:43:20 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by ^tamago^:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;Actually, up till now all interchanges are fully
air-conditioned. Bishan will be converted to one, and we can only
wait to see if the same will happen to Paya Lebar and Buona Vista.
(:&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;How abt Jurong East, CCK, Tanah Marah&lt;/p&gt;</description>
      <pubDate>Fri, 20 Jun 2008 18:43:20 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8182451</guid>
      <author>SBS n SMRT</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by ^tamago^ @ Fri, 20 Jun 2008 18:40:37 +0800</title>
      <description>&lt;p&gt;Actually, up till now all interchanges are fully
air-conditioned. Bishan will be converted to one, and we can only
wait to see if the same will happen to Paya Lebar and Buona Vista.
(:&lt;/p&gt;</description>
      <pubDate>Fri, 20 Jun 2008 18:40:37 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8182445</guid>
      <author>^tamago^</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Russianroulette2004 @ Fri, 20 Jun 2008 18:28:43 +0800</title>
      <description>&lt;p&gt;The new plan at Bishan is actually initiated by the LTA. As the
LTA anticipated increased passenger flow with the Circle Line and
hence possible overcrowding on the current platform, thus the
south-bound platform is built to relieve congestion. Furthermore,
poor ventilation on the south-bound platform meant that it (and the
whole Bishan station) has to be air-conditioned. The current
north-bound platform will also be upgraded as a result.&lt;/p&gt;
&lt;p&gt;SMRT will probably use increased operating costs (due to
increased train frequency) to raise fares. But not within the next
few months given their "promise".&lt;/p&gt;</description>
      <pubDate>Fri, 20 Jun 2008 18:28:43 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8182413</guid>
      <author>Russianroulette2004</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by SBS2695H @ Fri, 20 Jun 2008 14:23:37 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by Oceane:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
The Northbound platform will also be upgraded. A/C and PSDs will be
installed. If you look at the platforms carefully, there are holes
here and there, especially on the ceilings. Once the new SB
platform opens they will start upgrading the NB platform (in
stages).&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
Actually there is nothing wrong with the current NAC layout. I
don't know why SMRT wasted money on the NSL when their focus is the
CCL. Then they will use the new AC Bishan station as an excuse to
raise fares.&lt;/p&gt;</description>
      <pubDate>Fri, 20 Jun 2008 14:23:37 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8181878</guid>
      <author>SBS2695H</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Novawin&#8482; @ Thu, 19 Jun 2008 21:04:01 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by bus555:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
Erm sorry but I dont get&amp;nbsp;u by "southbound platform woule be
opposite the present one" do you mean a new track would be build
for the southbound with the north used the southbound one?&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;Check out at &lt;a href=
"http://en.wikipedia.org/wiki/Bishan_MRT_Station#Current_Station_Layout"
rel=
"nofollow"&gt;http://en.wikipedia.org/wiki/Bishan_MRT_Station#Current_Station_Layout&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;The track for NSL along Bishan MRT station will never be altered
or realigned. There is no new track for southbound train.&lt;/p&gt;
&lt;p&gt;So this is where you will alight at opposite side which is on
left side of train instead of right side of train where you are
currently alight at. It's like Braddell station for Southbound
train.&lt;/p&gt;</description>
      <pubDate>Thu, 19 Jun 2008 21:04:01 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8179946</guid>
      <author>Novawin&#8482;</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Novawin&#8482; @ Thu, 19 Jun 2008 20:58:24 +0800</title>
      <description>&lt;p&gt;For Nicoll Highway MRT station, the escalators at entrance/exit
point have been installed already and are covered up with big tent
above. I think they are going to construct entrance/exit box
soon.&lt;/p&gt;
&lt;p&gt;And Nicoll Highway MRT station will only have one entrance/exit
point which is opposite The Concourse via overhead bridge.&lt;/p&gt;
&lt;p&gt;Meanwhile, the exterior fittings for two of entrance/exit box
for MacPherson station are almost completing. The third one will
have exterior fittings being implemented sooner as its basic
foundation is completed. Dakota and Mountbatten are lagging behind
MacPherson and Paya Lebar in terms of construction pace.&lt;/p&gt;</description>
      <pubDate>Thu, 19 Jun 2008 20:58:24 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8179925</guid>
      <author>Novawin&#8482;</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Oceane @ Thu, 19 Jun 2008 19:51:34 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by
Russianroulette2004:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;Basically the layout of the Bishan North South line station will
be like this:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;New platform for south-bound trains, which means that the
current island platform in use will in the future serve north-bound
trains only. This is because the current south-bound platform will
be sealed once the new replacement platform on the opposite side of
the southbound track opens. This means that commuters must get to
the right platform in the future.&lt;br /&gt;&lt;/li&gt;
&lt;li&gt;No difference in the track layout. Trains still use the current
tracks.&lt;br /&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
The Northbound platform will also be upgraded. A/C and PSDs will be
installed. If you look at the platforms carefully, there are holes
here and there, especially on the ceilings. Once the new SB
platform opens they will start upgrading the NB platform (in
stages).&lt;/p&gt;</description>
      <pubDate>Thu, 19 Jun 2008 19:51:34 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8179734</guid>
      <author>Oceane</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Russianroulette2004 @ Thu, 19 Jun 2008 10:23:37 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by bus555:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
Erm sorry but I dont get&amp;nbsp;u by "southbound platform woule be
opposite the present one" do you mean a new track would be build
for the southbound with the north used the southbound one?&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;Basically the layout of the Bishan North South line station will
be like this:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;New platform for south-bound trains, which means that the
current island platform in use will in the future serve north-bound
trains only. This is because the current south-bound platform will
be sealed once the new replacement platform on the opposite side of
the southbound track opens. This means that commuters must get to
the right platform in the future.&lt;br /&gt;&lt;/li&gt;
&lt;li&gt;No difference in the track layout. Trains still use the current
tracks.&lt;br /&gt;&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Thu, 19 Jun 2008 10:23:37 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8178259</guid>
      <author>Russianroulette2004</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Scania @ Thu, 19 Jun 2008 01:17:47 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by bus555:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;&lt;br /&gt;
Erm sorry but I dont get&amp;nbsp;u by "southbound platform woule be
opposite the present one" do you mean a new track would be build
for the southbound with the north used the southbound one?&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;I suggest you go down to Bishan and see.&lt;/p&gt;</description>
      <pubDate>Thu, 19 Jun 2008 01:17:47 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8177790</guid>
      <author>Scania</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by bus555 @ Wed, 18 Jun 2008 16:56:38 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by Scania:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;There will just be an enlarged station concourse. The two tracks
will still be there, just that the southbound platform would be
opposite the present one.&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;&lt;br /&gt;
Erm sorry but I dont get&amp;nbsp;u by "southbound platform woule be
opposite the present one" do you mean a new track would be build
for the southbound with the north used the southbound one?&lt;/p&gt;</description>
      <pubDate>Wed, 18 Jun 2008 16:56:38 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8176554</guid>
      <author>bus555</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Scania @ Wed, 18 Jun 2008 04:03:34 +0800</title>
      <description>&lt;blockquote&gt;
&lt;div class="quote_from"&gt;Originally posted by bus555:&lt;/div&gt;
&lt;div class="quote_body"&gt;
&lt;p&gt;Just wondering, when the new glass doors&amp;nbsp;for new
entrance&amp;nbsp;at Bishan MRt (NSL twd Marina Bay) are in opereation,
what would happened to the twd JE one? it will be gone according to
someone. If it is, that means cauction first cause it would be the
station using one track for both direcion lol?&lt;/p&gt;
&lt;/div&gt;
&lt;/blockquote&gt;
&lt;p&gt;There will just be an enlarged station concourse. The two tracks
will still be there, just that the southbound platform would be
opposite the present one.&lt;/p&gt;</description>
      <pubDate>Wed, 18 Jun 2008 04:03:34 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8175393</guid>
      <author>Scania</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by bus555 @ Tue, 17 Jun 2008 23:09:58 +0800</title>
      <description>&lt;p&gt;Just wondering, when the new glass doors&amp;nbsp;for new
entrance&amp;nbsp;at Bishan MRt (NSL twd Marina Bay) are in opereation,
what would happened to the twd JE one? it will be gone according to
someone. If it is, that means cauction first cause it would be the
station using one track for both direcion lol?&lt;/p&gt;</description>
      <pubDate>Tue, 17 Jun 2008 23:09:58 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8174812</guid>
      <author>bus555</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
    <item>
      <title>Preparations for Circle Line Stage 6 replied by Novawin&#8482; @ Tue, 17 Jun 2008 22:33:55 +0800</title>
      <description>&lt;p&gt;&lt;span class=""&gt;CCL&lt;/span&gt; Stage 2 construction was started in
late 2004 or early 2005. Stage 2 is taking longer to be completed
than Stage 3 when Stage 3 construction was accelerated at very fast
pace. I think Stage 3 construction was started in 2005.&lt;/p&gt;</description>
      <pubDate>Tue, 17 Jun 2008 22:33:55 +0800</pubDate>
      <guid isPermaLink="false">www.sgforums.com:2080:262541:8174653</guid>
      <author>Novawin&#8482;</author>
      <link>http://www.sgforums.com/forums/2080/topics/262541</link>
    </item>
  </channel>
</rss>
